Production Control Organisation (PCO) Allowance: -
Staff on posting from shop floor to Production Control Organisation are eligible for PCO allowance at the following rates:
Section Engineers and Sr. Section Engineers in Level-7 in the Pay Matrix (VII CPC) - 6 % of Basic Pay
Non-Supervisory staff and Jr.Engineers up to Level-6 in the Pay Matrix (VII CPC) - 12 % of Basic Pay
The PCO Allowance will not be reckoned for any benefit such as DA, HRA, CCA, Pension, Gratuity and fixation of pay on Promotion.
RBE No. 112/2017& RBE No. 107/201
No comments:
Post a Comment